TagSpliceCommissioning control hub
Field note 001 / Rev A

The record between ready and handed over

Every tag.Every test.One handover you can trust.

Connect every tag, test, punch, and handover record.

TagSplice is an industrial project control hub that keeps field work, tests, issues, documents, and handover evidence connected from execution to operation.

Traceability, without the archaeology

A single thread from equipment tag to turnover.

The handover is not one document. It is the relationship between a thing, its tests, its defects, its proof, and the system it belongs to. Tagsplice keeps that relationship visible.

One source

Every tag

One outcome

Ready to hand over

Bring project, system, subsystem, instrument, and equipment registers into one connected record so every handover conversation starts from the same tag.

Workflow / 04 moves

Less spreadsheet archaeology. More controlled progress.

From first register import to final system completion, every move keeps the tag at the center of the conversation.

01

Assemble

Shape the project register around real systems, subsystems, and tags.

02

Verify

Record tests, certificates, inspections, and functional evidence at source.

03

Resolve

Turn punches and NCRs into visible, tag-linked work instead of loose ends.

04

Hand over

Readiness dashboards make the last mile clear, complete, and defensible.

No downloaded macrosAudit-ready trail

Built around the handover

A cleaner last mile for every project team.

Tagsplice gives each role the same connected record, with the detail and context they need to move work forward.

01

Commissioning managers

See what is truly ready to turn over, not just what has a green cell.

02

QA / QC teams

Keep the evidence trail close to the tag that needs to be proven.

03

Contractors

Find the next blocking punch without hunting across paper and spreadsheets.

04

Project owners

Receive a handover record that is readable, traceable, and audit-ready.

06 / Rollout + pricing

Start with the record you need to trust.

Roll Tagsplice out at the pace of the project: begin with one live register, make the handover visible, then give every team the same source of truth.

Talk through your rollout
Pilot

One live project

Establish the register, connect evidence, and give the project team a clear readiness view before handover pressure peaks.

01
Rollout

Every stakeholder, one record

Extend the same tag-to-test-to-punch-to-handover workflow across the teams and systems that need to move together.

02
Commercial

Scope a fit-for-project plan

Pricing follows the project shape, evidence surface, and rollout depth. We will confirm the exact plan in a walkthrough, with no checkout hidden here.

03

Evaluation-ready by design

Turn the handover into a connected record.

Start with the fictional example project and concise user manual, then bring us the shape of your own commissioning workflow.

Tag-linked commissioning controlTagSpliceEnd of field note